The seal is the Barrow group, a marine shale. The company said it expected the Moomba project, a joint venture with fellow gas company Beach Energy, to capture 1.7mn tonnes of carbon dioxide every year, meaning the storage capacity announced. The target reservoir is the Dupuy Formation, a massive turbidite sand deposit. Injection into the saline formation is planned to be via 8-9 injection wells with approximately 4 pressure management wells. The project plans to capture up to 3.3 MT/Yr of CO2 and store it in deep formations below Barrow Island. The gas is proposed to be piped 7km via an onshore pipeline and separated onshore at a processing facility on Barrow Island. The Greater Gorgon Fields lie 130-200km offshore and contain about 40 trillion cubic feet of gas. The commercial-scale CCS demonstration project will capture and store between 3.4 and 4 million tonnes of CO2 per year – a total of 120 million tonnes over the project’s lifetime, and 40 per cent of its emissions. The start date has now been pushed to 2016. At this time the project was 55% complete. In October 2012, Australian's energy minister Martin Ferguson, annonuced that the Gorgon project was still on track for injection to start in 2015. All necessary permits and approvals have been obtained (October 2010). The Australian Government accepted liability for Gorgon project (August 2009). This is the world's largest sequestration project and is supported by Australia's Government. Planned to be the first CO2 sequestration project in Australia. The Australian government has committed $60 million to the Gorgon CO2 Injection Project through the Low Emissions Technology Demonstration Fund(LETDF). The CO2 Injection project investment is estimated to cost approximately $2 billion. Colin Packham Energy and resources reporter 11.00pm Processing engineering firm KC8 Capture Technologies will construct and install a demonstration plant to capture carbon. Half of the six other LNG plants being built in Australia have sustained cost increases averaging more than 20%. Chevron increased the cost estimate by $15 billion in December 2012, is mainly due to labor shortages, logistics challenges and the strength of the Australian dollar. The project is estimated to cost US $55 billion. Injection is planned in anticipation of a carbon-tax. Storage: Deep onshore sandstone reservoirs, 2.5 Km below Barrow Island (The plan is to re-inject the extracted CO2 from the CO2-rich natural gas field) via 7 km pipline Start Date: Construction started SeptemStart date 2016ĬO2 Source: CO2 Capture from Natural Gas processing plant Location: Barrow Island, Western Australia. The company had to buy 5.23 million tonnes of carbon offsets and committed in late 2021 to invested 40 million in lower carbon projects in WA. Gorgon Fact Sheet: Carbon Dioxide Capture and Storage ProjectĬompany/Alliance: Gorgon Joint Venture (Chevron Australia, ExxonMobil, Shell, Tokyo Gas, Osaka Gas and Chubu Electric) The website is being kept online as a reference but will not be updated. As of September 30, 2016, the Carbon Capture and Sequestration Technologies program at MIT has closed.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |